Next acquisitions
When the satellites that can see the mission places pass next, sorted by time. A planned pass is not an image: it can be cancelled, and clouds can hide the ground.
| Time (UTC) | In | Mission | Track | Mode | Places covered | Basis | Confidence |
|---|---|---|---|---|---|---|---|
| Sentinel-1D SAR | 11 DESCENDING | IW | Santiago | official plan | high confidence source ESA acquisition-segment KML issued for 2026-10-09T18:52:52Z to 2026-10-29T20:48:00Z; segment 2026-10-10T11:14:02Z UTC to 2026-10-10T11:14:29Z UTC, datatake 9574; time at the place interpolated along the segment by latitude (good to the segment length); direction inferred from local solar time because the KML does not state it. A plan, not a delivery: ESA revises it and a planned segment can be dropped. | ||
| NISAR SAR | 4 frame 5 ASCENDING | L:SCI:DH:40M+05N:FS:B4:D02 | Santiago, Soná | official plan | medium confidence source NISAR REFERENCE observation plan for calendar 2026 (NASA KMZ): the frame is listed for this date with this radar mode. It is the reference plan, revised about every six months, not a commanded schedule. Time of day from the time of day of the last catalogued acquisition of this track and frame. | ||
| NISAR SAR | 4 frame 6 ASCENDING | 2026-10-12 | Santiago, Soná | official plan | medium confidence source NISAR REFERENCE observation plan for calendar 2026 (NASA KMZ): the frame is listed for this date with this radar mode. It is the reference plan, revised about every six months, not a commanded schedule. Time of day from the time of day of the last catalogued acquisition of this track and frame. | ||
| Landsat-9 optical | 013/055 DESCENDING | OLI/TIRS | Soná | orbit prediction | medium confidence source USGS Landsat acquisition-tool calendar: WRS-2 path 13 is overflown on cycle day 1. This is the overpass calendar, not the Landsat acquisition plan (the pending-acquisition files were not reachable); Landsat 8/9 image land in daylight almost always, but that is not a guarantee. Time of day from the last catalogued acquisition on 2026-09-26. | ||
| Landsat-8 optical | 012/055 DESCENDING | OLI/TIRS | Llano Bonito | orbit prediction | medium confidence source USGS Landsat acquisition-tool calendar: WRS-2 path 12 is overflown on cycle day 2. This is the overpass calendar, not the Landsat acquisition plan (the pending-acquisition files were not reachable); Landsat 8/9 image land in daylight almost always, but that is not a guarantee. Time of day from the last catalogued acquisition on 2026-09-27. | ||
| Sentinel-2C optical | 11 DESCENDING | NOBS | Santiago, Llano Bonito, Soná | official plan | high confidence source ESA Sentinel-2 acquisition-plan KML (2026-10-01T11:30:00Z to 2026-10-19T14:30:00Z), observation 2026-10-13T15:55:48Z UTC to 2026-10-13T16:01:56Z UTC, 102 scenes, plan state NOBS_NOMINAL; time at the place interpolated along the segment, which runs about six minutes: catalogue times for Sentinel-2 are the segment start, so expect this to be later than the catalogue habit. A planned observation: cloud decides whether the ground is seen. | ||
| NISAR SAR | 40 frame 85 DESCENDING | L:SCI:DH:40M+05N:FS:B4:D02 | Llano Bonito | official plan | medium confidence source NISAR REFERENCE observation plan for calendar 2026 (NASA KMZ): the frame is listed for this date with this radar mode. It is the reference plan, revised about every six months, not a commanded schedule. Time of day from the time of day of the last catalogued acquisition of this track and frame. | ||
| Sentinel-2A optical | 11 DESCENDING | NOBS | Santiago, Llano Bonito, Soná | official plan | high confidence source ESA Sentinel-2 acquisition-plan KML (2026-10-01T15:00:00Z to 2026-10-19T18:00:00Z), observation 2026-10-15T15:55:42Z UTC to 2026-10-15T16:01:50Z UTC, 102 scenes, plan state NOBS_NOMINAL; time at the place interpolated along the segment, which runs about six minutes: catalogue times for Sentinel-2 are the segment start, so expect this to be later than the catalogue habit. A planned observation: cloud decides whether the ground is seen. | ||
| Sentinel-1D SAR | 113 DESCENDING | IW | Santiago, Llano Bonito | official plan | high confidence source ESA acquisition-segment KML issued for 2026-10-09T18:52:52Z to 2026-10-29T20:48:00Z; segment 2026-10-17T11:05:46Z UTC to 2026-10-17T11:06:42Z UTC, datatake 98EA; time at the place interpolated along the segment by latitude (good to the segment length); direction inferred from local solar time because the KML does not state it. A plan, not a delivery: ESA revises it and a planned segment can be dropped. | ||
| Sentinel-1D SAR | 121 ASCENDING | IW | Llano Bonito | official plan | high confidence source ESA acquisition-segment KML issued for 2026-10-09T18:52:52Z to 2026-10-29T20:48:00Z; segment 2026-10-17T23:30:36Z UTC to 2026-10-17T23:31:31Z UTC, datatake 992F; time at the place interpolated along the segment by latitude (good to the segment length); direction inferred from local solar time because the KML does not state it. A plan, not a delivery: ESA revises it and a planned segment can be dropped. | ||
| Sentinel-2B optical | 11 DESCENDING | NOBS | Santiago, Llano Bonito, Soná | official plan | high confidence source ESA Sentinel-2 acquisition-plan KML (2026-10-08T12:00:00Z to 2026-10-26T15:00:00Z), observation 2026-10-18T15:55:18Z UTC to 2026-10-18T16:01:26Z UTC, 102 scenes, plan state NOBS_NOMINAL; time at the place interpolated along the segment, which runs about six minutes: catalogue times for Sentinel-2 are the segment start, so expect this to be later than the catalogue habit. A planned observation: cloud decides whether the ground is seen. | ||
| Landsat-8 optical | 013/055 DESCENDING | OLI/TIRS | Soná | orbit prediction | medium confidence source USGS Landsat acquisition-tool calendar: WRS-2 path 13 is overflown on cycle day 9. This is the overpass calendar, not the Landsat acquisition plan (the pending-acquisition files were not reachable); Landsat 8/9 image land in daylight almost always, but that is not a guarantee. Time of day from the last catalogued acquisition on 2026-09-18. | ||
| Landsat-9 optical | 012/055 DESCENDING | OLI/TIRS | Llano Bonito | orbit prediction | medium confidence source USGS Landsat acquisition-tool calendar: WRS-2 path 12 is overflown on cycle day 10. This is the overpass calendar, not the Landsat acquisition plan (the pending-acquisition files were not reachable); Landsat 8/9 image land in daylight almost always, but that is not a guarantee. Time of day from the last catalogued acquisition on 2026-10-05. | ||
| NISAR SAR | 141 frame 84 DESCENDING | 2026-11-02 | Santiago, Llano Bonito, Soná | official plan | medium confidence source NISAR REFERENCE observation plan for calendar 2026 (NASA KMZ): the frame is listed for this date with this radar mode. It is the reference plan, revised about every six months, not a commanded schedule. Time of day from the time of day of the last catalogued acquisition of this track and frame. | ||
| Sentinel-1D SAR | 11 DESCENDING | IW | Santiago | official plan | high confidence source ESA acquisition-segment KML issued for 2026-10-09T18:52:52Z to 2026-10-29T20:48:00Z; segment 2026-10-22T11:14:02Z UTC to 2026-10-22T11:14:29Z UTC, datatake 9B71; time at the place interpolated along the segment by latitude (good to the segment length); direction inferred from local solar time because the KML does not state it. A plan, not a delivery: ESA revises it and a planned segment can be dropped. |
Missions that could not be predicted
- Sentinel-1C:
- Sentinel-1A:
- Sentinel-1B:
- NISAR:
- Landsat-8/9 (acquisition plan):
- OPERA:
- Sentinel-2 Level-2A / cloud:
Basis tells how a time was obtained: an official plan is the operator's own; an orbit prediction is computed from the orbit; a cadence estimate only repeats the usual revisit interval and can be days off.
Tasking availability
The nearest windows in which a commercial radar satellite could be asked to image the mission places. Availability is not an order: nothing is requested from this page.
Status: not enabled (no credentials)
Commercial tasking is not enabled for this mission, so no opportunity is listed.
Public tier: no cost, no target box and no account details are shown.